In precast construction system, the elements are casted at the factory in closed environment under quality supervision using state of the art machineries. The finished elements are transported to the site and erected.
Based on the nature of the soil, the type of foundation is decided. It will be either Pile & Pile Cap or Open Foundation.
Top level of the pedestal is decided based on the finished floor level of the building. the pedestal is precast with the foundation bolts or the dowel bars.
Tie beams connecting the columns are also pre-stressed and they will span between the columns
Suitable for areas having very poor soil for considerable depths where Open Footings are not possible.
Grade of Foundation Concrete is M25
Open footing to keep the foundation Suitable for areas having good soil
Grade of Foundation Concrete is M25